Services
We are not a shop that ships a box. The four services below are work our own people do at your site — and three of them are already inside the price of the tub.
Setting the tub, pipework, electrics, the cold test and forty minutes of training. Inside the tub price across Indonesia.
View →Routes and transit times island by island, what the Rp 7.5-22 million actually pays for, and the two hardest destinations.
View →Rinsing, fin washing and pH checks, water treatment by city, and what the warranty deliberately does not cover.
View →How a tub outside the catalogue gets designed: samples, moulds, drawings for your architect, and the extra time and cost.
View →| Work | In the tub price? | Note |
|---|---|---|
| Site survey and heat-load calculation | Yes | Including outside Java |
| Drawings and material samples | Yes | 3-5 days after the survey |
| Delivery within Java and Bali | Yes | Our own trucks |
| Delivery outside Java | Separate | Rp 7.5-22 million by island |
| Installation and cold test | Yes | Technician flies with the unit |
| Civil work: pad, deck | Separate | Your own builder can do it |
| First-year service visits | Yes | Twice |
| Maintenance contract afterwards | Separate | From Rp 1.8 million a year |
The item most often misunderstood is the civil work. A 400-litre terrazzo tub full of water weighs about 780 kilograms concentrated in less than 1.5 square metres. On bare soil, paving or an old timber deck it will settle a few millimetres within a year and the overflow will stop running level. We ask for a 100 mm reinforced pad or pad footings. Your own builder can pour it from our drawing, usually for Rp 2-5 million.
Everything else is described on the individual pages: installation, inter-island delivery, maintenance and bespoke design. Prices for each component are on the pricing page.
Butuh bantuan memilih?
We reply with sizing, the right chiller and a full price.