Drawn, then cast
Every tub that leaves our workshop is made to order, but some are far further from the catalogue than others. This page explains how a shape that does not exist yet gets drawn, what it adds to the programme, and what it adds to the price.
The sequence is the same for a round terrazzo tub in a Bandung garden and for a hotel wet area in Nusa Dua. Only step three changes length, because the further a design sits from the catalogue, the more of it has to be seen with your own eyes before anything is cast.
The 40 per cent deposit is invoiced only after step four. Until the working drawings are approved you have paid nothing and we have cut no timber.
Our terrazzo is cast from Tulungagung marble aggregate with white cement in nine base mixes we have poured hundreds of times and can therefore guarantee. Chip size runs 4 to 12 millimetres and the aggregate-to-cement ratio is 2.4 to 1. After casting, the body cures for 14 days and is then wet-ground in three passes — coarse, medium, fine — with the rim finished by hand because no machine can follow an inside curve.
If you want a colour we have never cast — green Sukabumi aggregate in grey cement, say — we cast a single 20 by 20 centimetre sample and grind it to completion first. That costs Rp 2.4 million and five days, and it comes off the tub price if the order proceeds. We will not mix an untried colour straight into a shell worth tens of millions, and the same rule applies to every material on the products page.
About one tub in four we build is not a rectangle. The most requested are an oval for a garden and an L for a tight terrace corner. Every shape is possible to cast; three things change the moment the straight sides disappear.
The question that almost always arrives late is where the pump, the filter and the ozone unit are going to live. On a freestanding tub they hide inside the base frame. On a sunken tub or a solid stone body they need a space of their own, and that space has to be on the architect's drawing before the floor is finished, not hunted for afterwards.
Roughly 30 per cent of our bespoke work arrives through an architect, and those projects run most smoothly, because the structural decisions get made before the floor is poured. What we put on their desk is always the same package: the tub section in DWG, filled weight per square metre, pipe and drainage positions, electrical demand in amps, and plant room dimensions. All of it is free and none of it is binding.
What we ask from them is equally simple: the structural plan so the tub can sit over a beam, the finished floor level so the rim lands flush with the deck, and the nearest drainage point. With those three in hand from the start, a sunken tub can be cast at the same time as the floor, saving about two weeks and all the demolition that otherwise follows. On larger schemes we come in as a specialist subcontractor, which is described under custom wellness areas.
The figures below are additions to a catalogue tub in the same material and volume. Base prices per material are on the pricing page, and every one of these appears as its own line in the quotation rather than being melted into one large number.
| Bespoke work | Extra time | Extra cost |
|---|---|---|
| Terrazzo colour outside the nine standards | 5 days | Rp 2.4 million for the sample, credited if ordered |
| Oval, round or L-shaped body | 7 days | 15-25 per cent of the shell price |
| Seat or step cast into the body | 3 days | Rp 3.2-6.8 million |
| Sunken circulation tank under the deck | 5 days | Rp 7.5-12 million |
| Modular body for restricted access | 1 day on site | 12 per cent of the shell price |
| Onyx or marble slabs you select yourself | 14-21 days | per the slabs chosen |
| Brass inlay or a logo | 4 days | Rp 1.9-4.5 million |
| DWG working drawings for your architect | 3 days | free on orders above Rp 40 million |
If the budget is already tight, a custom shape is the first thing we suggest dropping. The Rp 8 million difference for an oval is better spent on one chiller size more, or on ozone. A rectangular tub whose water is genuinely 3 degrees is far more satisfying to own than a beautiful shape that never gets below 12.
Add the figures in the table above to the base lead time: 10 working days for Bali, 14 for Java, 20-35 elsewhere. An oval terrazzo tub with a cast seat, for Java, lands at about 24 working days from approval of the drawings.
Often, and we welcome it. Send the sketch or your architect's drawing and we return a castable version with notes on what has to change and why — normally corner radii, wall thickness and the position of the overflow.
None for the survey, the concept or the first sections. A terrazzo colour outside the nine standards is still charged at Rp 2.4 million because it is a real casting we actually do. Beyond that there is no fee and no obligation.
Yes, with a modular body that passes a 70-centimetre door and is assembled inside. What has to be checked first is floor strength, the drainage route and ventilation for the outdoor unit. If any of the three is missing we will say plainly that the room is not suitable.
What changes it is water surface area, not shape. An oval of 520 litres has about 12 per cent more surface than a 400-litre rectangle, which adds roughly 60 watts of load and about Rp 25,000 a month.
That is the most common bespoke request of all. What has to be planned together from the start is the distance from the sauna door to the rim, where the splash goes, and keeping the two machines from blowing warm air at each other — the layout rules are on sauna and ice bath packages.
Mulai
We return the tub section, the pipe positions and the outdoor unit location drawn onto your own file, normally within three working days.
We reply with sizing, the right chiller and a full price.