Island logistics
A crate holding 390 kilograms of stone does not travel like a parcel. We build the crates, book the container slots ourselves and fly the technician to meet the sailing, so that one visit finishes the job with the water already cold.
There is no central warehouse. A tub leaves from wherever it was made, and that sets both the route and the price. Stone and timber bodies go out of the Kediri workshop in Tabanan, Bali. Chillers, control panels and stainless shells go out of Cikarang in West Java. For anywhere beyond Java and Bali the two meet at Tanjung Perak in Surabaya or at Tanjung Priok and travel on in a single container.
For a mixed order — a terrazzo shell from Bali and a chiller from Java going to one address in Makassar — we consolidate in Surabaya and send it as one shipment. That adds three or four days, takes about Rp 3.2 million off handling, and removes the risk of half an order arriving first.
The last column is the one that matters: time from deposit to a finished cold test, not time in transit. These figures come out of our own shipping records and already include 10 to 14 days of production for a standard shell.
| Destination | Route | In transit | Deposit to cold test |
|---|---|---|---|
| Greater Jakarta and West Java | light truck from Cikarang | 2-5 hours | 14-18 days |
| Central Java and Yogyakarta | lorry on the Trans-Java road | 6-9 hours | 20-22 days |
| East Java | lorry on the Trans-Java road | 12-17 hours | 20-24 days |
| Bali | pickup from the Tabanan workshop | 20 minutes to 3 hours | 10-16 days |
| Lombok and the Gilis | Padangbai-Lembar ferry then truck | 1-2 days | 20-28 days |
| Lampung and Palembang | lorry via Bakauheni | 2-4 days | 20-22 days |
| Medan, Berastagi, Banda Aceh | lorry up eastern Sumatra | 4-7 days | 24-28 days |
| Batam and Tanjungpinang | container from Tanjung Priok | 4-8 days | 22-26 days |
| Kalimantan | container from Tanjung Perak | 4-7 days | 26-30 days |
| Sulawesi and Maluku | container via Makassar | 3-10 days | 24-32 days |
| Labuan Bajo and Kupang | container from Tanjung Perak | 5-9 days | 28-30 days |
| Sorong and Jayapura | container via Makassar | 9-14 days | 33-35 days |
We stopped using third-party packing in 2023, after a terrazzo body cracked along a lower rib on its way to Manado. Since then every crate is built in Cikarang from 3 by 7 centimetre meranti with three cross ribs, and the tub sits on 40-millimetre PE foam cut to the shape of its own body rather than simply wedged in place. Shock and tilt indicators go on every crate, and they are not decoration: if one has changed colour when the crate is opened, the insurance claim is filed that day with the evidence already complete, and you never have to argue with anybody.
Every shipment is insured all-risk at invoice value and the premium is already inside the freight figure. But insurance only returns money, and what you actually want is a tub standing and cold. So our responsibility does not stop at the destination port: until the unit is installed and the water reaches the promised temperature, any problem is ours.
A good number of our English-speaking orders are placed by people who are not yet in Indonesia, often for a villa still being finished. It works on three conditions. Someone local must be able to receive the crate, because a container cannot wait at a port. The site has to be genuinely ready, or we store the tub free of charge in the workshop for up to 60 days rather than letting it sit in the rain on your plot. And payment stays on the same terms as everyone else — 40 per cent after the drawings are approved, 40 per cent when the shell is ground and 20 per cent after the on-site cold test — so the last instalment falls due after the water is cold, whether you are standing next to it or watching the video. The full payment structure is on the pricing page.
This is not a freight margin. It is cost passed through, and the breakdown appears in your quotation so that you can check it line by line.
| Cost | South Sumatra | Kalimantan | Papua |
|---|---|---|---|
| Crate and packing | Rp 1.2 million | Rp 1.6 million | Rp 2.1 million |
| Truck to the origin port | Rp 1.1 million | Rp 1.4 million | Rp 1.4 million |
| Container slot or consolidated load | Rp 2.4 million | Rp 5.8 million | Rp 9.5 million |
| Handling at both ports | Rp 0.9 million | Rp 1.8 million | Rp 2.6 million |
| All-risk insurance | Rp 0.4 million | Rp 0.7 million | Rp 1.1 million |
| Flights and accommodation, two technicians | Rp 1.5 million | Rp 3.4 million | Rp 5.3 million |
| Total invoiced | Rp 7.5 million | Rp 14.7 million | Rp 22 million |
A forklift or crane at your end if a truck cannot reach the site, entry permits for an industrial estate or a resort compound, and civil work. All three are normally under Rp 4 million and all three are cheaper if you arrange them locally, because we would be paying outsider prices. What our crew does once the crate is open is described under installation and cold test.
Gili Trawangan has no cars at all. From Lombok the crate crosses on a wooden boat and is pulled from the jetty to the site by cidomo. So every tub for the Gilis is designed modular from the drawing stage: no module above 120 kilograms, all of them liftable by four people without equipment. The body is assembled, grouted and ground on site, adding two working days, and the total from deposit to cold test is 28 days — the second longest in our network. The longest is Papua. A container to Jayapura via Makassar spends 10 to 14 days at sea and the whole job runs 35 days, which is why we put a year of consumables in the same crate: relay, start capacitor, temperature sensor, two filter cartridges and a spare pump seal. Nine faults in ten can then be cleared by a local electrician on a video call, and that is the only honest way to sell refrigeration 3,700 kilometres from the workshop.
Before the deposit, in writing in the quotation, and it does not change afterwards. If shipping rates rise between order and sailing, we absorb the difference. That holds for Papua as much as for Lampung.
Yes, and we remove freight from the quotation. You also lose transit damage cover, and we still charge the technician's travel if you want us to install. For stone bodies we usually advise against it.
We check road width from photographs and maps at survey. Where it is genuinely narrow the load transfers to a pickup or moves manually on skid boards, and the extra labour of Rp 1.5-3.5 million is named in the quotation.
In its crate, up to six weeks with no harm, as long as it is not rained on directly or stacked. A chiller should not sit crated for more than three months because the compressor oil needs to circulate. If your building is not ready we store it free for 60 days.
Yes, and highland clients in places like Berastagi and Batu often do exactly that because they start on block ice. The chiller follows later at much lower freight, roughly Rp 1.4-4.8 million depending on the island — the units themselves are on ice bath chillers.
Mulai
Freight is fixed before the deposit and does not move afterwards, including when shipping rates rise between order and sailing.
We reply with sizing, the right chiller and a full price.